Barnet, Enfield and Haringey Mental Health Trust (BEH) outsourced its digital services transformation services to Atos. The Trust has around 40 locations across London, mainly within the boroughs of Barnet, Enfield and Haringey. These sites vary in size from small (circa 50 Network Connected devices) to campus (circa 200 Network Connected devices). There are interdependencies between certain sites for connectivity. BEH’s current end-user devices include 1517 Laptops, 2181 Desktops, and 100 iOS Tablets.
In 2018/19 Atos strategic healthcare partner “Bates IT” facilitated the next stage of the “Digital Transformation Project” refreshing ageing hardware and standardise the operational environment with a new Windows 10 Operating System with a “core” set of applications distributed by “System Centre” SCCM branch Cache Servers.
On arrival Bates IT cleared, legacy equipment & added to empty trolleys, while new equipment was added to desks.
Existing equipment removed from sites & returned to dedicated storage area.
Set-up and configured new Windows 10 device & performed basic checks with user present.
Bates IT managed reporting and audit trails vital for the project management streams:
Developing a standard user “Sign Off” process to capture proof of delivery, validation of functional applications & acceptance:
Securely stored and managed hardware equipment within a dedicated storage area. Pre-imaging hardware (to support the project timelines)
“During a Windows10 deployment for the Barnet, Enfield and Haringey Mental Health Trust, Bates IT provided both engineering and logistical support for the rollout. The programme had large significance to the Trust as every employee would be affected for a time during the project. The feedback received from users was extremely positive which was due to the knowledgeable, friendly and professional Bates engineers who always went above and beyond. Bates IT were also extremely flexible throughout the project, they were willing and able to adapt to the customer’s needs very quickly, leading to a successful deployment and a satisfied customer. I would be pleased to work with Bates on another IT deployment project and would not hesitate to recommend Bates IT to colleagues and other organisations.”
2700 Windows 10 devices between February & June 2019.
The project completed on time, within budget.